Environment

Telangana reviews the first phase of Musi rejuvenation

Telangana reviews the first phase of Musi rejuvenation

Why in news?

Hyderabad Mail reported on 24 November that Telangana Chief Minister A. Revanth Reddy had reviewed the Musi River rejuvenation project and other Hyderabad infrastructure proposals. The first phase covers about 21 kilometres of a wider 55-kilometre corridor. The discussion concerned the links between the reservoirs west of the city and the riverfront area around Bapu Ghat. River cleaning, restoration and access to historic sites involve different kinds of work along that corridor.

The river through Hyderabad

The Musi rises in the Ananthagiri Hills west of Hyderabad. It flows east through the city and belongs to the Krishna basin. Osman Sagar is on the Musi and Himayat Sagar is on the Esi. Their drainage meets near Bapu Ghat. The reservoirs, the tributary and the downstream urban river belong to one drainage network.

The location helps explain why the condition of the river depends on more than the condition of its banks. Water and material from the catchment move towards the river. In a city, rainfall can run off hard surfaces quickly. Sewage that reaches stormwater drains or the river can degrade water quality even where a short stretch of bank has been improved.

What a phased plan can achieve

A plan can divide the work into reaches so that surveying, sewage interception, riverbank work and public access can be sequenced. Sewage interception collects flows that would otherwise discharge into the river and directs them towards treatment. Progress can be measured by checking which outlets have been connected and how water quality changes downstream.

Heritage access is another part of describing the corridor. Improving access to old sites and spaces can connect them to the river’s history. That benefit follows from completed works and usable routes. The review concerns the order and scope of work in the first phase.

Conclusion

The Musi project links the river’s catchment with drainage, heritage and public space in Hyderabad. The first phase is one stretch of a wider programme.

Sources

Prelims MCQ Practice

Evaluate Your Retention

Assess your readiness with 3 high-yield multiple-choice questions on this article.

Mark your answers, submit, and see the key with explanations. Answers count only toward anonymous totals — nothing is linked to you, and it resets when you close this tab.

Practice questions 0 of 3 answered

Your result

0 / 3

Only anonymous totals are kept — nothing is linked to you. This resets when the tab closes.

1.

With reference to two reservoirs west of Hyderabad, consider the following pairs:

1.Osman Sagar — Musi
2.Himayat Sagar — Esi

Which of the pairs given above is/are correctly matched?

2.

The Musi, which flows through Hyderabad, belongs to which one of the following river basins?

3.

In an urban river programme such as the Musi rejuvenation project, what is the purpose of sewage interception?

Answer all 3 questions, then submit.
Daily news News Blitz Daily quiz Prelims PYQs Live Economic Data Subject notes How to prepare for UPSC Books and NCERTs Syllabus Exam pattern Eligibility and attempts Previous Year Papers Free Downloads Shorts Sign in